Hardcore and Type 1 time
Now there is a retaining wall to work with, the Type 1 and the Sand for blinding have arrived. I managed to
Now there is a retaining wall to work with, the Type 1 and the Sand for blinding have arrived. I managed to
So we have started to lay the blocks around the perimeter of the building, and anticipate building up two courses all the
So, after waiting forever for my underground soil fittings to arrive after they were missed off the first delivery, I ended up
Today I had a quick go at breaking out the old bottle gully in order to change it into a soil drain
So today the footings were poured, or should I say, pumped. The concrete people turned up, set up the pump and just
So, I decided to buy a new cement mixer rather than buy a second hand one with questionable reliability and it turned
So, following the approval from building control we have started to get the footings dug. Got Tristam Mayes from Mayes Plant Hire